Skip to main content

Table 5 Chlorine stockout length and frequency prior to STREAM device installation

From: Performance and acceptability of the STREAM Disinfectant Generator for infection prevention and control practices in primary health care facilities in Uganda

 

Average stockout length (days)

Average number of stockouts per year

Total days per year without chlorine

Health center III (n = 3)

40.1

2.0

80.2

Health center IV (n = 3)

44.1

3.0

132.3

District hospital (n = 3)

10.3

2.5

25.8

Regional referral hospital (n = 1)

29.5

2.2

64.9

Overall average (n = 10)

29.7

2.5

74.3